RIDOS COMBO

Consisting of Zinc, Boron, Molybdenum, special chelating agents and biostimulants, Rıdos COMBO provides the intake of these elements that plants need for flowering, encourages pollen formation, improves flower quality, so plants produce better quality and vibrant flowers.

Description

  • Quality Flowers attract pollinating bees and improve the quality of fertilization.
  • When Rıdos COMBO is applied, it strengthens the flower stem and decreases the flower drop.

GUARANTEED CONTENT By mass (w/w)%
Water Soluble Boron (B) 5
Water Soluble Molybdenum (Mo) 1
Water Soluble Zinc (Zn) 2

HERB FROM THE LEAF
APPLICATION
FROM EARTH
APPLICATION
IRRIGATION
Tomato, Pepper, Cucumber, Eggplant, Zucchini, Greens etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare During the vegetation period, it is recommended to apply 2-3 times with an interval of 15-20 days.
Plum, Cherry, Cherry, Apricot, Peach, Apple, Pear, Olive, Quince, Pomegranate etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare During the vegetation period, it is recommended to apply 1-2 times with an interval of 15-20 days.
Hazelnut, Walnut, Pistachio, Almond, Chestnut etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare It is recommended to make 1-2 applications after fruit set and at 15-20 days intervals.
Citrus 100-200 cc/100 lt water per decare. 1.5-2 lt/decare It is recommended to make 2-3 applications after fruit set and at 15-20 days intervals.
Melon, Watermelon etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare It is recommended to make 2-3 applications after fruit set and at 15-20 days intervals.
Vineyard, Banana, Strawberry, Raspberry etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare It is recommended to make 2-3 applications after fruit set and at 15-20 days intervals.
Corn, Sunflower, Beet, Cotton, Lentil, Cereals, Forage Crops etc. 100-200 cc/100 lt water per decare. 1.5-2 lt/decare During the vegetation period, 2 applications with an interval of 15-20 days are recommended.
Wheat, Barley, Oats, Paddy etc. 100-200 cc/100 lt water per decare. It is recommended to make a second application during the tillering period and 10-15 days later.

Registration Documents

RIDOS COMBO